The Project
Challenge
The building relied on an aging 120-ton blower system dating back to the 1960s. After repeated repairs, the system failed completely at the beginning of summer and left the building without cooling.
Custom Commercial HVAC Replacement
Durham, NC • 2026
After a 120-ton blower system dating back to the 1960s failed, All Weather removed the old equipment, fabricated a new air handler in-house, and installed a Q-Pac FanWall system.
Project Gallery
Photos coming soon
This area is ready for project photos when they become available.
The Project
The building relied on an aging 120-ton blower system dating back to the 1960s. After repeated repairs, the system failed completely at the beginning of summer and left the building without cooling.
What All Weather Did
All Weather removed the failed system, fabricated a new air handler in its shop, and installed a new Q-Pac FanWall system. The removal and installation were completed in approximately two weeks.